ISO 9001:2000: Your beamlock exceeds all British Standards; managed to
international quality assurance standards for diy timber buildings ISO 14001:2004: The Beamlock Building Company's factory holds
international environmental certification for diy timber structures Investor in People: Our people offer the best timber building service
through a qualified Investor in People training and development firm Green Dragon: The only timber building company to hold Welsh
Environmental Quality Standard Award   Examples of timber beamlock buildings

> Home / Technical Information / Building Assembly Instructions /

Building Assembly Instructions

Stage 1

 

Assemble first pair of posts:

A, Lay two posts on flat surface and fix beam by hammering pin into post connection, locking the beamplate into the cruciform. Place the ‘goal’ posts vertically in the setting out positions and temporally support (with e.g scaffold board)

B, Check that the post tops are horizontal using a spirit level and straight edge or other means. All post tops must be at the same level. Establish desired eaves height by adjusting base plates.

Beamock Assemebly Instructions Stage 1 Diagram

Stage 2

 

Lower beam into position and fix by hammering fixing pin (apply grease to al pins for ease of insertion/removal) to post connection. Place top plate into position before any further pins are inserted. Continue by tapping pins through top plate into appropriate position.

Beamlock Assemebly Instructions Stage 2 Diagram

Stage 3

 

Fix the end plates by using fixing pins to connect to the post cruciform. Secure top plate with two 100mm wood screws.

Recommended – Fix preservative treated 47 x 100mm wall plates flush to the outer edge of the beam.

Assembly Instructions Stage 3 Diagram

Stage 4

 

Offer up brace into mortises and fix with Beamlock 12mm brace pins (apply grease to all nail pegs and pins for ease of insertion/removal)

Assembly Instructions Stage 4 Diagram

Stage 5

 

The height-adjustable Beamlock base plate is an integral part of the Beamlock Building System and must be fixed to a suitable base (e.g concrete or brickwork). The fixing of each column base plate should be according to the following:

·Resistance to vertical uplift should be greater than 5.5kN

·Resistance to horizontal shear should be greater than 3.5kN

·The above are working loads and should be factored according to the manufacturer’s recommendations

·Chemical fix anchor bolts M10 to an appropriate depth should be provided to all holes in the column base plate and fitted in accordance with the manufacturer’s instructions to resist the required loading

·Ensuring a suitable foundation and pull our capacity of the substance should be the contractor’s responsibility.

A Surface Mounted
B Below Surface

Assembly Instructions Stage 5 Diagram

Beamlock - The Beamlock Building Company are authorised designers,
suppliers and installers of beamlock timber kits Dealing with a Chartered Building Consultancy gives you access to the
very best timber frame ideas and building advice. TRADA - As members of TRADA, our Technical staff have access to the most
up-to-date timber building research and knowledge. Green Register of Construction Professionals: environmentally sustainable
diy timber frame garages, car ports, and modular buildings. Business in the Community - Having won this Award in 2004, 2005 and 2006,
our Group takes action on corporate social responsibility Association of Environment Conscious Builders - Builder member of the
AECB, we can build environmentally friendly beamlock kits. TRA - All Roof Trusses supplied with our Beamlock Kits are designed and
manufactured by a Trussed Rafter Association member. Wales Quality Centre: as members we ensure the highest quality,
especially when coupled with the ISO 9001:2000 Wood for Good is the largest timber promotional campaign ever in the UK.
The Beamlock Building Company is a keen supporter of their work.
The Beamlock Building Company is part of The Benfield ATT Group